IMG_2711
survey-2

SURVEY AND LAYOUT OF ROADS

The key to successful road marking is the layout (or pre-marking) of the lines. When a road or parking lot is reconstructed, new lines are required.  Our Supervisors must transfer the design of an Engineered drawing onto the physical road.  This requires our Supervisors to understand the general specifications written in the BC MOT Manual of Standard Pavement Markings and the specific requirements of each job site.  Often, discrepancies arise between the drawings and the actual dimensions on site, making a seamless layout difficult.  However, our ability to problem solve, in the field, is why many customers hire us for their projects.

© Copyright 2016 Scottish Line Painting Ltd Website Design by Burst! Creative Group